Home MidAmerican Contact Us
 
Power Search
Advanced Search
North Umpqua River above Copeland CK near Toketee Falls,OR

The flows represented by this gage station are in the North Umpqua River's Wild and Scenic Reach downstream of the North Umpqua Hydroelectric Project, and Boulder Creek (a wilderness stream).

Real-Time flow data for this site is available from gage station 14316500 funded by PacifiCorp and managed by the USGS.

Forecasted flows for a nearby tributary, Steamboat Creek, are provided by NOAA's Northwest River Forecast Center.

Tentative 2008 schedule of planned waterway maintenance for North Umpqua Hydroelectric Project waterways which may affect flow in bypass reaches.   Maintenance has been planned to occur during the Settlement Agreement preferred periods to the greatest extent possible.   Dates are tentative and can change without notice due to weather, equipment, personnel, and other issues.   Unplanned emergency shutdowns may occur at any time.   For details contact Rich Grost, PacifiCorp, 541-498-2617.   Revised 4/24/08.

 

Waterway Approximate dates of maintenance Bypass reach flow affected? Fish salvage needed? Fish liberated to?

Notes

Lemolo 1 None        
Lemolo 2 5/6    yes    no   16 hr shutdown, some flow retained in canal 
Clearwater 1 4/24 yes  no    10 hr shutdown, some flow retained in canal 
Clearwater 2 7/14 - 10/18 Yes Yes Toketee Lake For CSD construction
Toketee 5/12 - 29, 6/9 - 26 Maybe No   Two units remain running; bypass may have higher flow than otherwise
Fish Creek When forced by natural flows No No   Waterway screened; no fish
Slide Creek 3/27 Maybe No   Maintenance for 2 - 4 hours
Soda Springs None        
  © Copyright, PacifiCorp, 2008 Online Use Policy