Wind Integration

Goodnoe Hills

PacifiCorp is conducting a wind integration cost study to be completed in August 2010, and which will be included in the Company’s 2011 Integrated Resource Plan to be filed with its state commissions in the first quarter of 2011. The study is intended as a collaborative effort with public stakeholders, involving public meetings, conference calls, and postings of stakeholder comments and questions/answers on this Web page.

Below are materials associated with this study effort. Please contact the IRP mailbox for questions or comments on the wind integration information. The IRP e-mail address is IRP@PacifiCorp.com.

2010 Wind Integration Study

Documents

PDF 2010 Wind Integration Study (9-1-2010)

PDF 2010 Draft Wind Integration Study (8-12-2010)

________________________________________

PDF NREL Meeting Summary Report (5-24-2010)

PDF Project Method for the 2010 Wind Integration Cost Study (5-19-2010)

PDF 2010 Wind Integration - Draft Study Design (2-26-2010)

PDF Map of owned and purchased wind generation

 

Presentations

PDF April 28, 2010 Meeting

PDF February 16, 2010 Meeting

 

Question and Answers

PDF Wind Integration Q&A (version 3-9-2010)

 

Stakeholder Comments

Comments on "Draft Study Design" (2/26/2010 version)

PDF Received Public Comments on Draft Study Design (Multiple Parties)

Comments on Project Method Paper

Comments on 4/16/10 version

PDF Received Public Comments on Project Method paper (NREL, RNP)

Comments on 4/23/10 version

PDF National Renewable Energy Laboratory

PDF Northwest Power and Conservation Council (part 1)

PDF Northwest Power and Conservation Council (part 2)

PDF Renewable Northwest Project

PDF Utah Association of Energy Users

PDF Utah Clean Energy

PDF Utah Division of Public Utilities

Comments on Draft Study (8-12-2010)

PDF Idaho Power

PDF Interwest Energy Alliance

PDF Renewable Northwest Project (RNP),

PDF RNP-Comments 2, Example Calculation (.xls)

PDF Utah Association of Energy Users

PDF Utah Division of Public Utilities

PacifiCorp Response to Comments

PDF Response to Comments on Methodology (6-21-10)

PDF Response to Additional RNP Comments on Methodology (6-21-10)

PDF Response to Michael Milligan Comments from 5/24/10 Meeting (6-21-10)