2012 Base Load RFP
Listed below is all of the information available for the Base Load RFP process. More information will be made available as it is released. Question and answers should be directed to the independent evaluators at www.merrimackenergy.com.
Closing of Base Load RFP
Utah
Oregon
Base Load RFP (Issued April 5, 2007)
- Attachment 7 – Lake Side Specification (2.0MB)
- Attachment 8 – Currant Creek Specification (3.0MB)
2012 RFP Draft Documents
Independent Evaluator
- White Paper: "Bid Evaluation Methods in Competitive Solicitations" (PDF) - Boston Pacific Company
Scheduling
PUBLIC MEETINGS AND WORKSHOPS
Technical Conferences
Bidder Conference
Stakeholder Conference