Rogue River

PacifiCorp operates five developments in the Rogue River basin constructed between 1911 and 1957.

Each development and its licensed generation capacity are provided below:

  • Prospect No. 1: 4.6 MW
  • Prospect No. 2: 36 MW
  • Prospect No. 3: 7.2 MW
  • Prospect No. 4: 0.9 MW
  • Eagle Point: 2.8 MW

The Prospect Nos. 1, 2, and 4 Hydroelectric Project (FERC Project No. 2630) is located on the Rogue River near the town of Prospect, Oregon.

Water from a separate facility, Prospect No. 3 Hydroelectric Project (FERC Project No. 2337) on the South Fork (South Fork dam) of the Rogue River, is diverted into the Middle Fork canal after passing through the Prospect No. 3 powerhouse.

Learn more about the Prospect hydroelectric projects

Project contact

Steve Albertelli
Program Manager
PacifiCorp
925 South Grape Street
Medford, OR 97501
(541) 776-6676
steve.albertelli@pacificorp.com