2025 Washington Situs RFP Documents & Appendices – DRAFT

Filed for commission approval on June 10, 2025

Main Document

RFP Main Document

Appendix A: Technical Specifications and Required Submittals

Appendix A – Technical Specifications and Required Submittals

Appendix A-2 – Interconnection Studies and Agreements

Appendix A-3 – Permitting Matrix

Appendix A-5 – Facility Single-Line Drawing and Layouts

Appendix A-9 – Product Data Equipment Supply Matrix

Appendices B-E

Appendix B-1 – Notice of Intent to Bid

Appendix B-2 – Bid Proposal Instructions and Required Information

Appendix C-1 – Bid Summary and Pricing Sheet Instructions

Appendix C-2 – Bid Summary and Pricing Input Sheet

Appendix C-3 – Energy Performance Report

Appendix C-3.1 – Wind Inputs

Appendix C-3.2 – Solar Inputs

Appendix D – Bidder’s Credit Information

Appendix D-1 – Form of Letter of Credit

Appendix E-1 – PPA for Standalone Generation

Appendix E-2 – PPA for Generation with Energy Storage

Appendix E-3 – ESA for Energy Storage

Appendices G-P

Appendix G-1 – Mutual Confidentiality Agreement

Appendix G-2 – Non-Reliance Letter

Appendix I – Standards of Conduct; Separation of Functions

Appendix J – Seller Authorization to Release Generation Data to PacifiCorp

Appendix P – Non-Price Scoring Questionnaire

Appendices R-V

Appendix R – Bid Scoring and Modeling

Appendix R-1 – Bid Scoring Example

Appendix S – Cybersecurity Requirements

Appendix T – PacifiCorp’s Washington Load

Appendix V – Explanation of Bid Deposits and Processing

Appendix W – Wire Instructions for Bid Fees and Deposits